- Inputs for Obtaining Environmental clearance.
- Project feasibility report with economics for financial Institutes.
- Technology evaluation and process Block diagram preparation.
- Sizing of Equipment based on plant proposed capacity and future requirement.
- Tentative Utility design and technology evaluation for treatment plant.
- Development of proposed foot prints on site plan.
- Preparation of proposed equipment list with Specs & Budgetary cost.
- Preparing dimensional floor wise layout of plant building within and outside battery limits to freeze the footprints.
- Submission of floor wise load calculations as an input to structural designer.
- Preliminary Effluent characterization and treatability studies at our lab.
- Soil testing and tentative building and structural cost.
- Freezing the dimension, Specification and MOC of equipment and Preparing Comprehensive list for the same.
- Complete Civil/Structural Engineering Package which includes foundation drawings, building design, cutout drawings with BOQ.
- GA drawings of equipment in ActCAD which needs to be fabricated.
- Floor wise GA Drawing of plant &utility.
- Development of P&ID and Utility line diagram
- Imposing GA drawings of suppliers in our proposed layout to check suitability.
- Elevation drawing preparation.
- Heat & Mass balance across each equipment and process simulation through ASPEN/CHEMCAD.
- Mass balance of various effluents streams and proposing treatment methodology.
- Agitator power requirement calculations & Transformer ratings.
- Preparing BOQ for Pipelines & Electricals.(GA & SLD)
- Development of Process data sheets for processequipment (PDS) which includes Agitator, pumps, valves, Reactors, column etc.
- Piping layout Isometric views.
- Design of Fuel handling & Material Handling systems.
- Co-ordination with Structural Engineer.
- Checking foundations with respect to Drawings through total station.
- Assistance in evaluation of quotations and bidding process.
- Co-ordination with Civil, Mechanical, Electrical & Pipeline Contractors (MEP).
- Hydro test & Working test before delivery.
- Assistance in Erection & Plant commissioning.